Installation Guide

3
Installation S19-120FMBF
Bradley • 215-1261 Rev. G; ECN 17-05-039 7/18/2017
Supplies Required
Pipe sealant
Piping to 1" NPT water supply inlet
Adequate supply pipe supports
Minimum 4" (102 mm) drain to
accommodate 30 gallons (115 liters) per
minute discharge for shower waste
(2) Ceiling fasteners (holes in cover plate
are Ø 1/4")
Sign-mounting hardware
Install drench shower
1. Rough-in the necessary ceiling cutouts as
shown.
2. Connect the drench shower piping as
shown on page 4.
3. Apply pipe sealant to all male-threaded
pipe joints.
4. The bottom edge of the showerhead should
be 7'-0" (2134 mm) from the floor.
5. Assemble the showerhead components
(Item 6) as shown on page 4.
Connect water supply
NOTICE! Do not rely on Bradley’s Drench
Shower to support supply piping.
1. Connect water supply piping to 1" NPT
inlet on unit (piping supplied by installer).
Provide adequate supports (supplied by
installer) for supply pipe using pipe hangers
or other means.
2. Thread the showerhead assembly onto the
elbow (Item 3). The showerhead shell will
be held in place by the springs.
3. Mount the safety sign to the wall using
sign-mounting hardware supplied by
installer.
8-1/2"
(216mm)
minimum
Specify ceiling height
Ø 5" (127mm)
4" (102mm)
minimum
Ø 5-7/8"
(149mm)
2" (51mm)
2"
(51mm)
1-7/8"
(48mm)
Ø 3-1/4"
(83mm)
Ø 5/16"
(8mm)
(2)
places
20-1/8"
(511mm)
False ceiling
maximum
thickness
2" (51mm)
4-1/2" to 6"
(114mm to 152mm)
Spring
Spring
Bracket
Showerhead
Shell
Ceiling
Tile
Showerhead
Assembly
Ring
9" (229mm)