Installation Guide

3
Installation S19-120BF, S19-120ABF
Bradley • 215-1259 Rev. F; ECN 17-05-039 7/18/2017
Supplies Required
Teflon tape and pipe sealant
Piping to 1" NPT water supply inlet
Adequate supply pipe supports
Minimum 4" (102 mm) drain to accommodate
30 gallons (115 liters) per minute discharge for
shower waste
Sign-mounting hardware
Assemble components
1. Assemble components as shown on page 4.
2. Apply pipe sealant (supplied by installer) to all
male-threaded pipe joints.
3. Thread the jam nut onto the threaded end
of the pull rod. Thread the pull rod onto
the coupling and tighten the jam nut. The
triangular end of the pull rod must be in line
with the hook end (see page 4).
4. Bottom edge of showerhead should be 7'-0"
(2134 mm) from the floor.
Connect water supply
NOTICE! Do not rely on Bradley’s Drench Shower
to support supply piping.
1. Connect water supply piping to 1" NPT inlet
on unit (piping supplied by installer). Provide
adequate supports (supplied by installer)
for supply pipe using pipe hangers or other
means.
2. Mount the safety sign to the wall using sign-
mounting hardware supplied by installer.
6"
(152mm)
9"
(229mm)
Ø 10-3/4"
(273mm)
7'-0"
(2134mm)
to Floor
24"
(610mm)
S19-120BF
S19-120ABF
4-1/2"
(114mm)
Ø 3.1"
(78.7mm)
45"
(1142mm)
7'-0"
(2134mm)
to Floor
24"
(610mm)
3-5/8"
(92mm)
8"
(203mm)
3-5/8"
(92mm)
8"
(203mm)
9"
(229mm)
45"