Installation Guide

3
Installation S19-110BF
Bradley • 215-1417 Rev. F; ECN 17-05-039 7/18/2017
Supplies Required
(3) 3/8" floor anchors and bolts
Teflon tape and pipe sealant
Piping to 1-1/4" NPT water supply inlet on unit
Adequate supply pipe supports
Min. 4" drain to accommodate 30 gallons per
minute discharge for shower waste
OPTIONAL: sign-mounting hardware
Secure base to floor
1. Install three suitable anchors (supplied by installer)
for 3/8" bolts in the floor.
2. Bolt the base to the floor anchors using 3/8" bolts
(supplied by installer).
Assemble components
1. Assemble the remaining unit components as
shown on page 4.
2. Apply pipe sealant (by installer) to all male-
threaded pipe joints.
3. Use the rubber grip pad provided or a strap
wrench around pipes when tightening to prevent
marring. Place the grip pad on the pipe, then put
the wrench over the grip pad and turn the pipe
with the wrench.
4. Bottom edge of showerhead should be 7'-0"
(2134mm) from floor.
Connect water supply
NOTICE! Do not rely on Bradley’s Combination Unit to
support supply piping.
1. Connect water supply piping to 1-1/4" NPT inlet
on unit (piping by installer). Provide adequate
supports (by installer) for supply pipe using pipe
hangers or other means.
2. Hang the safety sign from the unit with the curtain
hooks provided (or mount it to the wall using sign-
mounting hardware by installer).
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow for
+/- 1/8" (3mm) per threaded joint. To find the tolerance
of a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8" (3mm).
33-3/8"
(847mm)
4-1/2"
(114mm)
3.1"
(78.7mm)
45"
(1142mm)
9"
(229mm)
42"
(1067mm)
to Floor
7'1"
(2159mm)
to Floor
Ø 9" (229mm) Flange
with (3) Ø 3/8" (10mm)
Holes on Ø 8" (203mm)
Bolt Circle