Installation manual
SS-3N/AST/STD, SS-3N/AST/WH Installation
2 12/11/07 Bradley Corporation • 215-1494 Rev. E; ECN 07-814
IMPORTANT!
Read this entire installation manual to ensure proper installation. When fi nished with the
installation, fi le this manual with the owner or maintenance department. Compliance and
conformity to local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
any packaging material. If any parts are missing, do not begin installation until you obtain the
missing parts.
Make sure that all water supply lines have been fl ushed and then completely turned off
before beginning installation. Debris in supply lines can cause valves to malfunction.
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to
installation. Electrical power MUST remain off until unit and optional water heater have
been plumbed. After installation is complete, turn on the water supply fi rst, then turn on the
electrical power.
Hardware supplied by installer must be appropriate for wall construction. Wall anchors must
have a minimum pull-out rating of 1,000 lbs. Follow appropriate dimensions for standard or
juvenile height based on confi guration and required rim height. Overtightening fasteners can
damage the Terreon
®
material. Use caution when tightening bowl and sprayhead fasteners.
Product warranties may be found in the “Products” section on our Web site at www.
bradleycorp.com.
Installation
T
H
I
S
S
ID
E
U
P
Packing List
•
•
•
•
Special Note for Sprayhead/Bowl retrofi t
to retrofi t new SS-3N sprayhead onto existing SS-3 bowl
1-1/2" (38mm)
Drill hole Ø 1" (25mm)
to 1-1/2" (38mm).
Existing Hole
2-1/4" (57mm)