Installation manual
SS-2N/AST/STD, SS-2N/AST/WH Installation
2 10/24/11 Bradley Corporation • 215-1498 Rev. F; ECM 11-08-011
IMPORTANT!
Read this entire installation manual to ensure proper installation. When finished with the
installation, file this manual with the owner or maintenance department. Compliance and
conformity to local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material. If any parts are missing, do not begin installation until you obtain the missing
parts.
Make sure that all water supply lines have been flushed and then completely turned off before
beginning installation. Debris in supply lines can cause valves to malfunction.
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to
installation. Electrical power MUST remain off until unit and optional water heater have been
plumbed. After installation is complete, turn on the water supply first, then turn on the electrical
power.
Hardware supplied by installer must be appropriate for wall construction. Wall anchors must have
a minimum pull-out rating of 1,000 lbs. Follow appropriate dimensions for standard or juvenile
height based on configuration and required rim height. Overtightening fasteners can damage the
Terreon
®
material. Use caution when tightening bowl and sprayhead fasteners.
Product warranties may be found in the “Products” section on our Web site at bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
•
•
•
•