Solid Vent Kit Install Instructions

11
10. From outside the building, slide the five (5) inch (12.7 cm) diameter
telescopic tube through the opening in the wall until the outer wall
mount plate is flush with the wall (See Figure 9).
Figure 9
11. Using the supplied special RTV silicone sealant, apply a bead one (1)
inch (2.5 cm) from the end of the three (3) inch (7.6 cm) diameter tube
that is part of the vent-air intake terminal. Slide the direct vent-air intake
terminal into the three (3) inch (7.6 cm) diameter telescopic tube that
extends through the wall and position it so it is flush with the outer wall
mount plate. Make sure that the rain guard and the word “HOT” on the
end of the direct vent-air intake terminal are oriented properly. Secure
the direct vent-air intake terminal to the outer wall mount plate and wall
with four (4) #10 x 1 inch screws (supplied) (See Figure 10). Note:
Certain construction of walls may require the use of different type of
anchoring means than supplied. DO NOT modify the direct vent-air
intake terminal or outer wall mount plate.