Installation / Operation Instruction Manual
BLP SERIES Install, Operation, and Maintenance Manual
SECTION 4: MAINTENANCE
Rev-1 Bradford White • 200 Lafayette St. • Middleville, MI 49333 Page 62 of 83
BrutePlate Manual Phone: (800) 531-2111 • Website: www.BradfordWhite.com 02/26/2020
4.10 INSPECTION SCHEDULE
Table 4-4, below, summarizes the recommended time intervals for inspection of the water
heater, components, inlet and outlet water and energy source lines (boiler water or high
temperature water), and power connections.
TABLE 4-4: RECOMMENDED INSPECTIONS TIME
INTERVAL TABLE
TO BE
INSPECTED
PER
MANUFACTURE
SPECS.
WEEKLY
MONTHLY
3
MONTHS
6
MONTHS
1
YEAR
Recirculation
Pump
X
Control Valve
X
Temperature and
Pressure Gauges
X
Heat Exchanger
Plates
and Gaskets
(measure performance)
X
Inlet,
Outlet and Return
Connections
X
Power and Ground
Connections
X
Relief Valves
X
Isolation
Valves
X
Strainers
X
Control Panel and
Thermocouples
X