Installation / Operation Instruction Manual

BLP SERIES Install, Operation, and Maintenance Manual
SECTION 4: MAINTENANCE
Rev-1 Bradford White 200 Lafayette St. Middleville, MI 49333 Page 47 of 83
BrutePlate Manual Phone: (800) 531-2111 Website: www.BradfordWhite.com 02/26/2020
4.2 POWER CONNECTION REWIRING
If any of the power connections must be rewired at the electrically activated controls or junction
boxes, follow the steps listed below.
POWER CONNECTION REWIRING INSTRUCTIONS
1) Follow Steps 1 through 5 of the shutdown procedure (Sec. 3.8) to take the unit offline
before attempting any electrical service.
WARNING!
TURN OFF/DISCONNECT ALL ELECTRIC POWER BEFORE ATTEMPTING ANY
MAINTENANCE PROCEDURE.
2) After assuring the power has been turned off, disconnect and rewire the electrical
connection in question. Refer to Section 6.4 for wiring details.
3) Turn the power on to check that the component that has been rewired is functioning properly.
4) Follow the startup procedure instructions in Section 3.7 of this manual to return the unit to
operation.