Installation / Operation Instruction Manual

BLP SERIES Install, Operation, and Maintenance Manual
SECTION 3: OPERATION AND CONTROLS
Rev-1 Bradford White 200 Lafayette St. Middleville, MI 49333 Page 28 of 83
BrutePlate Manual Phone: (800) 531-2111 Website: www.BradfordWhite.com 02/26/2020
3.8 UNIT SHUTDOWN PROCEDURES
All maintenance procedures require the water heater to be properly shut down. Follow the
instructions below in order to shut down the BLP Series unit:
UNIT SHUTDOWN PROCEDURE INSTRUCTIONS
1. Close all valves in the energy source inlet line (boiler water or high temperature water).
2. Turn off all power to the electric control.
3. When possible, relieve the pressure from energy source line (boiler water or high
temperature water), between the shutoff valve and the unit.
4. Wait 5 minutes or until dial thermometer starts dropping. Close all remaining valves in the
system in this order.
a. Hot water outlet line
b. Cold water inlet line
c. Boiler/high temperature water return line.
5. After the system has cooled, drain the unit by opening the heat exchanger drain valve
and holding the relief valve in the open position. This will prevent the formation of a
vacuum and increase the drainage flow.
6. Proceed with the required maintenance or repairs.
7. After performing the required maintenance or repairs, return the unit to operation by
following the startup procedures described above in Section 3.7.