Installation / Operation Instruction Manual
BLP SERIES Install, Operation, and Maintenance Manual
SECTION 2: INSTALLATION INSTRUCTIONS
Rev-1 Bradford White • 200 Lafayette St. • Middleville, MI 49333 Page 14 of 83
BrutePlate Manual Phone: (800) 531-2111 • Website: www.BradfordWhite.com 02/26/2020
2.4 UNIT PLACEMENT
The unit should be mounted to the suitable floor, concrete pads, or structural construction,
following factory guidelines and applicable architectural and local code requirements to assure
the safe operation of the unit.
NOTES:
1. Proper rigging techniques should be followed while moving heavy equipment.
2. Maintain proper levels in order for the unit to function properly and follow clearance,
dimensional, and applicable piping drawings.
CAUTION!
Refer to Section 2.5 Piping Installation and Unit Connections for piping and installation
instructions. BLP Series units must be installed to permit relief valve drain per local codes.