Installation / Operation Instruction Manual

BLP SERIES Install, Operation, and Maintenance Manual
SECTION 2: INSTALLATION INSTRUCTIONS
Rev-1 Bradford White 200 Lafayette St. Middleville, MI 49333 Page 10 of 83
BrutePlate Manual Phone: (800) 531-2111 Website: www.BradfordWhite.com 02/26/2020
SECTION 2: INSTALLATION INSTRUCTIONS
WARNING!
INSTALLER MUST COMPLY WITH STARTUP AND INSTALLATION INSTRUCTIONS TO
AVOID A DANGEROUS SITUATION.
Startup and installation forms MUST be submitted to a local representative or risk loss of
coverage under warranty.
The inspection log must be maintained and up-to-date and kept in close proximity to the
BLP Series unit for inspection.
NOTE:
The startup must be performed by a factory authorized representative.
2.1 RECEIVING, HANDLING, AND STORAGE
BLP Series water heater base frame is designed in such a way that they can be carried from all
four directions using forklifts or pallet jacks provided. The unit must be properly supported over
the forks, as indicated by the arrows in Figure 2-1.
FIGURE 2-1: Support Slots for Transport
2.1.1 Examining the Unit
BLP Series water heaters are thoroughly inspected and tested prior to shipment. Upon receipt
of the BLP Series water heater, please carefully inspect the entire unit and its components for
any damages during shipping. If any evidence of damage is detected that could affect the safe
operation of the unit, contact Factory or the authorized sales representative to report the
damage and to receive instructions on how to proceed.
TRANSPORT UNIT USING
BOTH SUPPORT SLOTS