Installation / Operation Instruction Manual

BLP SERIES Install, Operation, and Maintenance Manual
SECTION 2: INSTALLATION INSTRUCTIONS
Rev-1 Bradford White 200 Lafayette St. Middleville, MI 49333 Page 11 of 83
BrutePlate Manual Phone: (800) 531-2111 Website: www.BradfordWhite.com 02/26/2020
After the inspection has been completed, we advise that all pressure and control components
be checked to assure that they meet design specifications, the name plate and the specification
tags. In case of any discrepancy, contact Factory or an authorized sales representative, before
proceeding with the installation.
2.1.2 Compliance with Codes
The BLP Series water heater is constructed and stamped in accordance with ASME Boiler and
Pressure Vessel Code, Section VIII Division 1. Other codes or approvals which apply will be
labeled on the BLP Series water heater.
The BLP Series water heater installation must be performed only by technically qualified
persons. The installation must conform to all national, state, or provincial and local code
requirements established by the authorities having jurisdiction as well as specific instructions in
this manual. Authorities having jurisdiction should be consulted before installations are made.
2.2 SITE PREPARATION
A firm and level foundation is required (a six- to eight-inch thick concrete pad is preferable).
Secure the BLP Series water heater to the building floor or mounting pad. For attachment to
the foundation, use the four holes in the base.
Proper rigging techniques should be followed while moving unit around.
The BLP Series
water heater must be plumb and level to function properly.
The BLP Series
water heater should be placed with at least 12 headroom clearance.