Installation / Operation Instruction Manual

Table Of Contents
Page 13
24is required at Top to service the unit.
Rear Top Panel is an
access panel for the
servicing of
the Ignitor
and
Flame Rod.
3” / 12”
3” / 12”
Min /
Suggested
18” / 24”
11” / 24”
4” Min
3” Max
Figure 3. Clearances
Table 3. Clearances
1.K Clearances
NOTES : A 4” high equipment pad is required.
This pad must NOT extend more than 3” beyond the
boiler base structure at the rear of the boiler.
24” top clearance is required to service the unit.
at back of unit.
Clearances
inches cm inches cm
Front 18 46 24 61
Back 11 28 24 61
Left 3 8 12 30
Right 3 8 12 30
Top 24* 61 24* 61
Note: A 4" high equipment pad is required.
This pad must NOT extend more than 3" beyond the boiler base structure at the rear of the boiler.
*24" top clearance is required to service the unit.
Clearance to
Combustibles
Suggested
Service
Clearance
18
24
Minimum Clearance
11
3
3
to