Operator`s manual

OPERATING INSTRUCTIONS
OPERATING TECHNIQUES
ATTACHMENT TYPE BACKHOES
MISCELLANEOUS - BACKFILLING
To backfill an excavation, lower the extended bucket into the spoil
pile. Curl the bucket and lift it clear of the spoil pile. Swing the bucket to
the excavation and extend the bucket. Return the bucket to the spoil pile
and continue the cycle until the job is completed.
IMPORTANT: Do not backfill by using the swing circuit and dragging the
bucket sideways. Doing so could cause damage to the dipper, boom, and
swing cylinders or mainframe.
IMPORTANT: Avoid constant jarring or hammering contact between the
spoil pile and the loaded bucket as this may cause premature wear to the
backhoe pins and bushings.
MISCELLANEOUS - EXCAVATING BY A WALL
To excavate by a wall, where the wall will interfere with the stabilizer
placement, move the backhoe in at an angle to the wall. Concentrate on
getting the swing pin as close to the wall as possible while leaving enough
swing arc left to dump the spoil.
MISCELLANEOUS - HARD GROUND OPERATION
When digging in hard ground, it may be necessary to decrease the
bucket angle of entry to the point where the back of the bucket almost
contacts the ground. It may also be necessary to apply downward pressure
with the boom on the bucket.