Operator`s manual
OPERATING INSTRUCTIONS
OPERATING TECHNIQUES
ATTACHMENT TYPE BACKHOES
TRENCHING BETWEEN A BUILDING
AND AN OPEN EXCAVATION (CONTINUED)
Position the unit so the backhoe swing post is over the centerline of
the trench connection. Dig with the backhoe at extreme swing positions,
and in as close to the stabilizers as possible. Pile the soil on the opposite
side of the trenches.
Position the unit forward so the two trenches can be connected. Pile
the spoil on the opposite side of the trench.
3991
8-20-91-3
G
G










