Instruction manual

84
G3
H3
I3
K3
L3
M3
Screw down with moment spanner.15kg CAPACITY with 8 NM,
30kg CAPACITY with 10 NM.
Put the spacer and then screw down 2 screws in it.
Screw down with moment spanner.15kg CAPACITY with 8 NM,
30kg CAPACITY with 10 NM.
With X mm ruler to adjust the limit size of back 2 screws. With Y mm ruler to adjust the limit size of front 2
screws inspacer.(capacity:6/15kg X=1.2mmY=0.9mmcapacity:15/30kg X=1.9mmY=1.3mm)
Insert the loadcell harness to main PCB.
Install the up cover, print paper cover,up spacer,screws in interface PCB, cover of main PCB at bottom etc.
Adjust 4 screws in up spacer and let the spacer levelly.
Put on platter.
Power on scale.
Hanging type:
bPro-H2
Take out loadcell
J3