Instruction manual
81 
F3 
• Install the tower to base. 
• Put on platter. 
• Power on scale. 
Hanging type: 
bPro -H2 
Take out display   
• Power off and take out the power cable from electrical outlet.   
• Take away platter.   
• Take out back display kit as previous method.   
• Take away display harness in display. 
• Screw out 4 bolts (F3) in the display support plate, and take out the back display.   
• For front display, you should also take away the main PCB and power PCB, then to 
show the front display, screw out 4 installation bolts. 
Install display   
• Put the back display to right position and screw in 4 bolts to fix it.   
• Plug in harness of display.   
• Install the back display kit. 
• Install back display cover. 
• Install whole hanging scale. 
• Put on platter.   
• Power on scale. 










