Installation Instructions
SERIES 5001
SLIDING GLASS DOOR
Page 3 of 19
Step 2. Assemble knocked down (KD) frame (see Figure B).
• Layout the frame and clean it for sealant application. Sealant is critical, and it must be
tooled to ensure no pinholes or openings.
• Butter the frame edges with sealant.
• Fasten horizontals to verticals with #10 × 1¼ PHL PH SMS. It is helpful to use wax on
the screws to assist with screw installation. Don’t torque screws too tight and risk snapping
them off.
• Seal the exterior corners of frame (see Figure C).
• Seal the interior frame and aesthetically clean it. Seal all openings.
Figure B
OPTIONAL CAULK BACKER
#10 X 1 1/4" PHL PH SMS
BUTTER FRAME EDGES
WITH SEALANT
HEAD ANTI TAKE OUT
#10 X 3/4" PHL PH
SMS TEK SCREW
OPTIONAL CAULK BACKER
SNAP ON HEAD COVER
#10 X 1 1/4" PHL PH SMS
SNAP IN THRESHOLD COVER
BUTTER FRAME EDGES
WITH SEALANT
#10 X 1 1/4" PHL PH SMS
BUTTER FRAME EDGES W/
SEALANT BEFORE INSTALLING
OPTIONAL CAULK BACKER
SNAP IN SILL
ANTI TAKE OUT
BUTTER FRAME EDGES
WITH SEALANT
BUTTER FRAME EDGES
WITH SEALANT
#10 X 1 1/4" PHL PH SMS
Optional Caulk Backer
Butter frame edges
with sealant
Head Anti Take-Out
× ¾" PHL PH
Optional Caulk Backer
Snap on head cover
Snap in threshold cover
Butter frame edges
with sealant
Butter frame edges
with sealant before installing
Butter frame edges
with sealant
Butter frame edges
with sealant
Snap in sill anti take out
Optional Caulk Backer
#10 × 1 ¼" PHL PH SMS
#10 × 1 ¼" PHL PH SMS
#10 × 1 ¼" PHL PH SMS
#10 × ¾" PHL PH
SMS TEK Screw
#10 × 1 ¼" PHL PH SMS