Owner`s manual
10
Cable Routing and Storage
Squat Frame Pulley Cables
To install the Squat Frame Pulley cables, remove the ball end from the rope by pressing the insert out of the ball
(Figure A), and slide the ball off the rope. Route the cable under the pulley closest to the engine and reinstall
the ball end (Figure B).
Cable
Pulley
Figure A Figure B