Owner's Manual

Bowflex Xtreme
®
2 SE Assembly Manual
13
Step 14 Install Upper Lat Tower Assembly, Ab
Crunch Station and Lat Pulley
Parts:
Upper Lat Tower Assembly
Ab Crunch Station
Lat Pulley Housing (22)
Main Assembly
Hardware:
5 Button Head Screws 3/8" X 3/4" (I)
5 Flat Washers 3/8" (B)
Tool: 7/32" Hex Wrench
14 -1 Slide the Upper Lat Tower Assembly onto the Lower
Lat Tower as shown.
14-2 Place the Ab Crunch Bracket against back of the
Lat Tower Assembly. Align the bolt holes on the Ab
Crunch Brackets side flaps with the lower bolt holes
on the sides of the Lat Tower.
14-3 To attach the Ab Crunch Station to the Lat Tower,
install a 3/4” screw and washer through the upper bolt
hole on the Ab Crunch Station into the back of the Lat
Tower as shown in Detail 14a. Secure the Ab Crunch
Station to the sides of the Lat Tower with 2 screws
and washers as shown in Detail 14a.
14-4 Remove the plastic cap from the end of the the long
bolt (*) already installed in the back of the Lat Pulley/
Housing. Finger tighten the boltit will be removed
and reinstalled during Step 16 and 17.
14-5 Position the Lat Pulley Housing bracket against the
Lat Tower, over the Ab Crunch Station. Align the bolt
holes as shown in Figure 14b.
14-6 Place one washer over the end of each screw. Attach
the Lat Pulley Housing to the Lat Tower by installing
the screws loosely into the aligned holes as shown in
Figure 14b.
Do not tighten hardware at this time.
B
I
22
B
I
22
*
Assembly Guide
Detail
14a
Figure 14b
Figure 14a