Owner's Manual

39
Installing Your Bowflex Ultimate
®
2 Cables
Cable Installation STEP 5
a. ObservetheCableroutinginFigureA.
b. UnscrewtheNutandpulltheLongScrewoutjust
enoughtoanglethePulleyAssemblyandallowthe
CabletothreadbetweentheRodandthePulley.
(See Figure B)LeavetheLongScrewlooseuntilyou
haveroutedtheCableontheothersideoftheunit.
Figure A
Figure B
Floating Pulley
Long Screw
Hex Nut
Washer
Cable
Rod
Tool:
•HexKey(7/32”)
•Wrench(9/16”)- or Adjustable Wrench
Cutaway of
Rod Box
Floating Pulley