Owner's Manual
35
Installing Your Bowflex Ultimate
®
2 Cables
Cable Installation STEP 1
a. UncoilcablefromUpperPulleySlider.
b. RemoveBallStopfromtheendofcablethatisto
beroutedthroughpulleysbyslidingtheouterball
backfromthecableendandpushingouttheslotted
insert.Slidetheballoffofthecableandsetaside.
(See Figure A)
c. RemovethepulleyfromtheUpperPulleyBracket,
wrap the cable over the pulley (See Figure B)and
reinsertthepulleybackintotheUpperPulley
Bracket.MakesurethecableisinsidetheSide
PlatebeforemovingontoSTEP2.(See Figure C)
Slide Ball Back
Remove Slotted Insert
Cable End
Remove Pulley from
Upper Pulley Bracket
Pulley
Route Cable
Over Pulley
Replace Pulley and Hardware
with Cable
Cable Routed Inside
Side Plate
Figure B Figure C
Figure A
Tool:
•HexKey(7/32”)
•Wrench(9/16”)- or Adjustable Wrench