Safety Information
Page 13 of 13
Report Ref. No.: 68.210.18.0104.01
Attachment No. 1
IEC60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TÜV SÜD Certification and Testing (China) Co., Ltd. Shenzhen Branch
Test Report National and Group Differences for IEC 60950-1 2
nd
Ed.+A1+A2 Rev. 10
US United States of America
US
4.2.8.1
Enclosures around CRTs with a face diameter of
160 mm or more are required to reduce the risk of
injury due to the implosion of the CRT.
N/A
4.3.2
Equipment with handles is required to comply with
special loading tests.
N/A
4.3.8
Battery packs for both portable and stationary
applications are required to comply with special
component requirements.
N/A
5.1.8.3
Equipment intended to receive telecommunication
ringing signals is required to comply with a special
touch current measurement tests.
N/A
5.3.7
Internal (e.g., card cage) SELV circuit connectors
and printed wiring board connectors that are
accessible to the operator and that deliver power
are to be overloaded.
During abnormal operating testing, if a circuit is
interrupted by the opening of a component, the
test shall be repeated twice (three tests total)
using new components as necessary.
P
6.4
Equipment intended for connection to
telecommunication network outside plant cable is
required to be protected against overvoltage from
power line crosses in accordance with 6.4 and
Annex NAC.
N/A
Annex
EE
UL articulated accessibility probe (Fig EE.3)
required for assessing accessibility to
document/media shredders instead of the Figure
2A test finger.
N/A
Annex
M.2
Continuous ringing signals up to 16 mA only are
permitted if the equipment is subjected to special
installation and performance restrictions.
N/A
Annex
NAD
Equipment connected to a telecommunication and
cable distribution networks and supplied with an
earphone intended to be held against, or in the ear
is required to comply with special acoustic
pressure requirements.
N/A