User Manual

Guidelines for Permanent Implantation
31
Option B. Extension Removal
1. Open the midline incision to expose the lead and connector.
2. Cut the lead extension at the connector.
3. Pull the lead extension through the tunnel and away from body at
the externalized site.
4. Loosen the connector setscrew using the torque wrench provided.
Disconnect and remove the connector.
Note: Connect a new lead extension, if necessary, to reach the
selected IPG site.