Instructions / Assembly
50mm
Floor
Panel frames
rest on floor.
50mm
panel cladding
overhangs floor
edge.
It is recommended
to drill pilot holes
with a 3mm drill for
each screw.
Drill
Side panel
50mm
50mm
Back panel
It is recommended to drill pilot
holes with a 3mm drill for each
screw in this section.
Drill
50mm
50mm
2. Wall panels
Position a large panel and a small panel as shown. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge. Ensure square and secure
using 3 x 50mm screws, screw through the frame of the small panel, into the frame of the large panel. Continue to add panels as shown below securing each one with
3 x 50mm screws.
1. Floor sections
Prepare a level area for the shed to sit of no less than 1870mm x 2450mm. With the three floor panels upside down, join together using 5 x 50mm screws as shown.
30mm
3. Apex panels, door header rail and door frame coverstrips
Place the rear apex panel on top of the back panel, make sure the bottom shiplap board of the apex panel fits correctly into the shiplap board of the back panel. Secure by
using 2 x 50mm screws, screw up through the top frame of the back panel into the bottom frame of the apex panel. Attach the front apex in the same way to the front
panels. Attach to the front apex the door header rail using 2 x 50mm screws. Secure it flush to the bottom of the apex framing. The door rebate coverstrips are positioned
between the floor and the header rail. Attach the coverstrips flush to the framing of the front panels using 4 x 30mm nails per strip.
Important note
To "VALIDATE" the guarantee, adequate provision must be made to ensure ground
contact is avoided and air is able to circulate underneath the building.
Placing the building on a concrete pad or slab base is acceptable provided that the
building is not allowed to sit in pooled water during wet conditions.
If the building is to sit on soil or grass it MUST be erected on pressure treated
wooden 50mm x 50mm or similar bearers (These are not supplied in the kit).
Rowlinson Garden Products recommend using pressure treated bearers with all
buildings on any type of base.
It is recommended
to drill pilot holes
with a 4mm drill
for each screw.
Drill
Front panels
Large plain panel
Small
panel
Large plain panel
Small
panel
Large plain panel
Large plain panel
Panel frame
Floor
Back panel
Side panel
4. Securing the walls to the floor
Ensure the panels are sitting square on the floor. Secure using 16 x 63mm screws, screw through the panel frames and into the floor and floor joists.
Floor joists
63mm
63mm
63mm




