Specifications
46
DISASSEMBLY PROCEDURES
2.3 Using a phillips-head screwdriver, re-
move the four screws that secure the
heatsink bracket to the heatsink. Lift off the
heatsink bracket.
2.4 Carefully lift the main PCB away from
the heatsink. Unplug the power transformer
secondary harness from the main PCB at
J5. Rotate the main PCB clear of the cabinet
until it is at about 90 degrees from the
heatsink. At this point, you should be able to
lift the PCB clear of the rear enclosure
mounting brackets.
3. Power Transformer Removal
3.1 Perform procedure 2 to remove the
amplifier/DSP PCB.
3.2 Using a phillips-head screwdriver, re-
move the four screws that secure the power
transformer to the bass module cabinet.
3.3 Lift the power transformer out of the
cabinet.
4. Input/Output Board Removal
4.1 Perform procedure 1 to remove the rear
enclosure.
4.2 Using a phillips-head screwdriver, re-
move the two screws that secure the input/
output board bracket to the rear enclosure.
Lift off the bracket. Slide the input/output
board out of the rear enclosure.










