Install Instructions

Table Of Contents
Making the electrical connections | 49
6 720 806 992 (2013/09)Greenstar
7.3.3 DHW tank loading pump or 3-way valve with spring return
(only heating boiler ZBR..-3A)
The pump used must have the following connection values: 120 VAC,
max. 2 A.
Route cable from pump or 3-way valve to appliance.
Insert cable into the junction box as shown in Fig. 54.
Connect cable to the red plug according to Fig. 53.
Fig. 53 Attach plug (external DHW tank loading pump or 3-way valve)
[1] L (120 VAC, 60 Hz)
[2] PE (GND, Ground)
[3] N (Neutral)
[4] Red plug (in the junction box upon delivery)
Connect red plugs and insert grommet until stop.
Fig. 54 Cable connected (external DHW tank loading pump or 3-way
valve)
Mount the 3-way valve for space heating operation when de-
energized, and DHW tank loading when energized.
Use service function 1.F to set pump mode. ( page 59).
7.3.4 Connecting mains power supply
Route the power cable (AC 120 V, 60 Hz) from the emergency shutoff
switch to the boiler.
Insert cable into the junction box as shown in Fig. 56.
Connect cable to the white plug according to Fig. 55.
Fig. 55 Attach plug (mains power supply)
[1] L (120 VAC, 60 Hz)
[2] PE (GND, Ground)
[3] N (Neutral)
[4] White plug (in the junction box upon delivery)
Connect white plugs and insert grommet until stop.
Fig. 56 Cable connected (mains power supply)
Mount junction box on the rail.
1
2
3
4
6 720 641 933-37.2O
L PE N
white
Mains
120V/60Hz
L PE N
red
Storage
tank pump
L PE N
black
CH pump
for mixed heating
8 737 701 503
I III III III
6 720 641 933-38.1O
1
2
3
4
6 720 641 933-36.2O
L PE N
white
Mains
120V/60Hz
L PE N
red
Storage
tank pump
L PE N
black
CH pump
for mixed heating
8 737 701 503
I III III III
6 720 641 933-39.1O