Specifications
Zubehör
9191
SPS - Kommunikationstreiber
Zubehör
89
Visualisierung / OPC-Server
87
SPS - Kommunikationstreiber
91
75
Programming/controlling of S5/7[FREEWARE without
support]-PLC’s
If you have to accomplish modifications in your installation, connect the
Remote maintenance of a S7-PLC[FREEWARE without support]
You have to solve a problem in the PLC-program, but the installation is
not placed nearby? No problem, start your PG-2000-software with "option
teleservice", activate your modem and after selection intra PG-2000-
software access to the PLC is possible as if being on-site.
PC with the PLC and start your programming package PG-2000. With
this software you have one and the same user interface for S5 and
S7[FREEWARE without support], so you don’t have to switch between
both versions, just as it is with most of other packages.
Data logging of your PLC
You shortly need a logging of your PLC’s operating states respectively
are on the way of figuring out a problem and have no datalogger? No
problem, connect the PC, start the PG-2000-software with "option
datalogger", define relevant variables, appoint timestamp and then the
recording starts running immediately. The data will be stored on the fixed
disc according to the configuration.
Backup of formulas without knowledge of PLC
You consistently have to back up formulas which are stored in data blocks
or back up production protocols, but the employee in charge has no
knowledge of PLC-programming respectively handling PC-programs? No
problem, install the PG-2000-software with "option DB-backup" on your
PC and connect it with the PLC. The employee only has to click on a
symbol on the desktop of the PC and the data blocks of the
parameterised PLC will be stored on the fixed disc. Afterwards the
program closes itself and the mentioned employee didn’t had to
accomplish an intervention on the program.
Project/history-administration of PLC-programming
Who doesn’t know this? When accessing the PLC you find out that parts
of the program flow has been changed and none of the
colleagues/employees are responsible for it? Therefore install the "option
controller" for the PG-2000-software, and every activity of the employees
working with the program will be recorded. So you can identify the one
employee very quickly and changes are ex post comprehensible, too.
STEP5 / STEP7 - programming










