COMMISSIONING REPORT FOR THE COMMISSIONING ENGINEER
6 720 803 687 (2012/11)94
16 COMMISSIONING REPORT FOR THE COMMISSIONING ENGINEER
The commissioning report will be completed and signed by the
commissioning engineer.
Action Confirmation / values
Refrigerant lines connected, insulated and tightness
of the refrigerant circuit checked.
Yes | No
Power supply established and BUS cable connected
to the external unit.
Yes | No
DIP switches of the external unit set and checked. Yes | No
The power supply to the external unit has been 'live' for at least 12 hours prior
to commissioning the overall system.
Yes | No
Heating system filled with water and pressure checked. Yes | No
Expansion vessel supply pressure Value: __________________ bar
Heating system charge pressure Value: __________________ bar
Power supply to the external unit isolated, BUS cable connected to the hybrid
Manager (internal unit).
Yes | No
Overall system switched on. Yes | No
FW200 programming unit connected to the Hybrid Manager. Yes | No
Heating pump set up in the heat appliance. Yes | No
FW200 programming unit configured
in accordance with the system set up
( separate operating instructions).
Yes | No
High efficiency pump in the Hybrid Manager (internal unit) set up. Speed stage I Speed stage II Speed stage III
T = _____ K; heating output = _____kW
Vented. Yes | No
Bypass valve set up. Value: __________________
Table 55 Commissioning report for the commissioning engineer
Action Confirmation / values
Parameters set. Yes | No
Boiler / air to water heat pump switched subject to: Cost-optimised Environmental factors
Environment and costs Changeover threshold
Energy price ratio of electricity / fossil fuel
Setting value: __________________
What is the primary energy factor for the fossil fuel?
Setting value: __________________
What is the primary energy factor for electricity?
Setting value: __________________
What should the dual mode switching threshold be?
Setting value: __________________
All casing parts fitted. Yes | No
User instructed and technical documentation handed over. Yes | No
Table 56 Commissioning report for the commissioning engineer