Technical data
Table Of Contents
- Table of contents
- 1 Key to symbols and safety instructions
- 1.1 Explanation of symbols
- 1.2 Safety instructions
- 2 About the appliance
- 2.1 Designated use
- 2.2 EU Declaration of Conformity
- 2.3 Data plate
- 2.4 Standard delivery
- 2.5 Accessories
- 2.6 Tools, materials and miscellaneous parts
- 2.7 General information on energy use and heat production
- 2.8 Function description of the hybrid manager
- 2.9 Handling circuit boards
- 2.10 Refrigerant circuit
- 2.11 Combi boiler with serial buffer tank, bypass valve and unmixed heating circuit
- 2.12 System boiler with serial buffer tank, bypass valve and unmixed heating circuit
- 2.13 Combi boiler with serial buffer tank, bypass valve, unmixed heating circuit and independently controlled mixed heating circuit
- 2.14 System boiler with serial buffer tank, bypass valve, unmixed heating circuit and independently controlled mixed heating circuit
- 2.15 Overview of components
- 2.16 Dimensions
- 2.17 Technical Data
- 3 Regulations
- 4 Transport
- 5 Mounting and installation
- 5.1 Preparing for installation
- 5.2 System component configuration
- 5.3 Pre-installing pipes
- 5.4 Mounting the hybrid manager
- 5.5 Installing the external unit
- 5.6 Installing the refrigerant circuit
- 5.7 Making the electrical connection
- 5.8 Installing the outside temperature sensor
- 5.9 Setting the DIP switches of the external unit
- 6 Commissioning
- 6.1 Before commissioning
- 6.2 Commissioning the system for the first time
- 6.2.1 Providing the external unit with a power supply ahead of commissioning
- 6.2.2 providing the external unit with a power supply during commissioning
- 6.2.3 Connecting the CANBUS cable to the hybrid manager unit
- 6.2.4 Making the power supply connection
- 6.2.5 Switching on the hybrid system
- 6.2.6 Connecting the programming unit to the hybrid control module
- 6.2.7 Connecting the heat source to the hybrid manager
- 6.2.8 Communication error from External unit on initial power ON of External Unit and Hybrid Manager
- 6.2.9 Adjusting the Hybrid manager circulating pump in the hybrid manager
- 6.2.10 System with series buffer tank
- 6.2.11 Venting the hybrid manager
- 6.2.12 Setting the bypass valve
- 6.2.13 Setting parameters for optimising energy use and costs of the hybrid system
- 6.2.14 Explanation of the parameters for energy and cost optimization of the hybrid system (control strategy)
- 6.2.15 Control Strategy: Option CO2 Optimised and co2 :cost mix
- 6.2.16 Control Strategy: Co2 optimised (environmental factors)
- 6.2.17 Control Strategy: CO2: Cost mix
- 6.2.18 Control Strategy: Option changeover temperature
- 6.2.19 Control Strategy: Cost optimised
- 6.2.20 Control strategy: hydraulic connection
- 6.2.21 Control strategy: Delay time for boiler heating
- 6.2.22 Control strategy: Temperature diff for boiler switch ON
- 6.2.23 Setting parameters at the hybrid control module
- 6.2.24 Commissioning of the air to water heat pump at outside temperatures outside the standard operating range
- 6.2.25 Informing the customer and handing over the technical documents
- 7 Operation
- 8 Environmental protection/disposal
- 9 Inspection and maintenance
- 10 Faults
- 10.1 Faults that are not displayed
- 10.2 Displayed faults
- Overview of internal hybrid fault indicators locations
- 10.2.1 Fault displays on the hybrid control module
- 10.2.2 Check temperature sensor of hybrid manager
- 10.2.3 Faults of the FW200 programming unit
- 10.2.4 Fault display on the FW 200 weather-compensated controller at user level
- 10.2.5 Fault display on the rear of the hybrid manager
- 10.2.6 External unit faults
- 10.2.7 Check components
- 10.2.8 DC fan motors/check PCB
- 10.2.9 Check external unit temperature sensor
- 10.2.10 Check linear expansion valves (LEV)
- 11 Replace components
- 11.1 Pumping refrigerant back into the external unit
- 11.2 Removing the casing from the external unit
- 11.3 Replacing the fan motor
- 11.4 Replacing the PCB housing
- 11.5 Replacing PCBs
- 11.6 Replacing faulty temperature sensors TH3, TH6 or TH33
- 11.7 Replacing outside temperature sensor TH7
- 11.8 Replacing temperature sensors TH4 and TH32
- 11.9 Fitting and removing the linear expansion valve
- 11.10 Removing the transformer (ACL)
- 12 Filling the refrigerant circuit
- 13 Appendix
- 13.1 Cost weighting electricity price — gas price
- 13.2 System wiring (heatronic III boiler connections) with a bypass valve and one unmixed heating circuit
- 13.3 System wiring (CUS boiler connections) with a bypass valve and one unmixed heating circuit
- 13.4 Wiring to PCB in the external unit (heat pump)
- 13.5 Controller circuit board in external unit
- 13.6 Alternative pipe work lengths and T
- 14 General details
- 15 Assembly and installation report for the installer
- 16 Commissioning report for the commissioning engineer

APPENDIX
6 720 803 687 (2012/11)88
No. Symbol Description
1 DNDM 1-2: Quiet running input (unavailable on this model)
1-3: External signal input
2 CN51 External output signals (compressor operation signal, fault displays)
3 CN52C Connection to interference suppressor
4 CN4 Control signals to inverter board
5 SV2 Bypass valve
6 21S4 4-way valve
7 CN2 Connection to power circuit board of external unit
1-5: control signals to the PCB (0—5V DC)
2-5: Zero-cross signal (0 — 5 V DC)
3-4: Not used
6-5: 16 V DC
7-5: 16 V DC
8 CNAC 2-4: PCB power supply (220 — 240 V AC)
1-3: power supply from the control cable to the hybrid manager (220 — 240 V AC)
9 CNS S1-S2: 220 — 240 V AC
10 +/- Supply voltage for communication D71 V, voltage 24 V DC
11 CNDC 280 V DC (inverter board 140 V)
12 CNF1, CNF2 Connection for fan motors
1-4: 280 V DC
5-4: 15 V DC
6-4: 0 — 6.5 V DC
7-4: 15 V DC at idle, 7.5 V DC during rotation, 0 — 15 V pulsed
13 V
SP
Voltage of pins on C5A, C5B: 0 V DC at idle, 1.5 V DC during rotation
14 V
FG
Voltage between the right-hand pins on PC5C and PC5D, pin 3 and pin 4 (same as CNF1)
15 TH33 Temperature sensor (liquid line)
16 TH32 Temperature sensor (compressor casing)
17 63H High pressure switch
18 TH7/6 Temperature sensor (heat exchanger, 2-phase mixture)
19 TH3 Temperature sensor (liquid line)
20 TH4 Temperature sensor (hot gas)
21 LEV-A, LEV-B Linear expansion valves
22 CNVMNT M-NET adapter (optional)
23 CNMNT M-NET adapter (optional)
24 CNM A-Control service tool
25 SW8
26 SW5 Function switch
27 SWP Pump back mode
28 SW4 Test mode
29 SW6 Model selection
30 SW1 Forced defrost mode, delete fault list, appliance address
31 SW7 Step control
Table 49 Key to inverter PCB










