Technical data
Table Of Contents
- Table of contents
- 1 Key to symbols and safety instructions
- 1.1 Explanation of symbols
- 1.2 Safety instructions
- 2 About the appliance
- 2.1 Designated use
- 2.2 EU Declaration of Conformity
- 2.3 Data plate
- 2.4 Standard delivery
- 2.5 Accessories
- 2.6 Tools, materials and miscellaneous parts
- 2.7 General information on energy use and heat production
- 2.8 Function description of the hybrid manager
- 2.9 Handling circuit boards
- 2.10 Refrigerant circuit
- 2.11 Combi boiler with serial buffer tank, bypass valve and unmixed heating circuit
- 2.12 System boiler with serial buffer tank, bypass valve and unmixed heating circuit
- 2.13 Combi boiler with serial buffer tank, bypass valve, unmixed heating circuit and independently controlled mixed heating circuit
- 2.14 System boiler with serial buffer tank, bypass valve, unmixed heating circuit and independently controlled mixed heating circuit
- 2.15 Overview of components
- 2.16 Dimensions
- 2.17 Technical Data
- 3 Regulations
- 4 Transport
- 5 Mounting and installation
- 5.1 Preparing for installation
- 5.2 System component configuration
- 5.3 Pre-installing pipes
- 5.4 Mounting the hybrid manager
- 5.5 Installing the external unit
- 5.6 Installing the refrigerant circuit
- 5.7 Making the electrical connection
- 5.8 Installing the outside temperature sensor
- 5.9 Setting the DIP switches of the external unit
- 6 Commissioning
- 6.1 Before commissioning
- 6.2 Commissioning the system for the first time
- 6.2.1 Providing the external unit with a power supply ahead of commissioning
- 6.2.2 providing the external unit with a power supply during commissioning
- 6.2.3 Connecting the CANBUS cable to the hybrid manager unit
- 6.2.4 Making the power supply connection
- 6.2.5 Switching on the hybrid system
- 6.2.6 Connecting the programming unit to the hybrid control module
- 6.2.7 Connecting the heat source to the hybrid manager
- 6.2.8 Communication error from External unit on initial power ON of External Unit and Hybrid Manager
- 6.2.9 Adjusting the Hybrid manager circulating pump in the hybrid manager
- 6.2.10 System with series buffer tank
- 6.2.11 Venting the hybrid manager
- 6.2.12 Setting the bypass valve
- 6.2.13 Setting parameters for optimising energy use and costs of the hybrid system
- 6.2.14 Explanation of the parameters for energy and cost optimization of the hybrid system (control strategy)
- 6.2.15 Control Strategy: Option CO2 Optimised and co2 :cost mix
- 6.2.16 Control Strategy: Co2 optimised (environmental factors)
- 6.2.17 Control Strategy: CO2: Cost mix
- 6.2.18 Control Strategy: Option changeover temperature
- 6.2.19 Control Strategy: Cost optimised
- 6.2.20 Control strategy: hydraulic connection
- 6.2.21 Control strategy: Delay time for boiler heating
- 6.2.22 Control strategy: Temperature diff for boiler switch ON
- 6.2.23 Setting parameters at the hybrid control module
- 6.2.24 Commissioning of the air to water heat pump at outside temperatures outside the standard operating range
- 6.2.25 Informing the customer and handing over the technical documents
- 7 Operation
- 8 Environmental protection/disposal
- 9 Inspection and maintenance
- 10 Faults
- 10.1 Faults that are not displayed
- 10.2 Displayed faults
- Overview of internal hybrid fault indicators locations
- 10.2.1 Fault displays on the hybrid control module
- 10.2.2 Check temperature sensor of hybrid manager
- 10.2.3 Faults of the FW200 programming unit
- 10.2.4 Fault display on the FW 200 weather-compensated controller at user level
- 10.2.5 Fault display on the rear of the hybrid manager
- 10.2.6 External unit faults
- 10.2.7 Check components
- 10.2.8 DC fan motors/check PCB
- 10.2.9 Check external unit temperature sensor
- 10.2.10 Check linear expansion valves (LEV)
- 11 Replace components
- 11.1 Pumping refrigerant back into the external unit
- 11.2 Removing the casing from the external unit
- 11.3 Replacing the fan motor
- 11.4 Replacing the PCB housing
- 11.5 Replacing PCBs
- 11.6 Replacing faulty temperature sensors TH3, TH6 or TH33
- 11.7 Replacing outside temperature sensor TH7
- 11.8 Replacing temperature sensors TH4 and TH32
- 11.9 Fitting and removing the linear expansion valve
- 11.10 Removing the transformer (ACL)
- 12 Filling the refrigerant circuit
- 13 Appendix
- 13.1 Cost weighting electricity price — gas price
- 13.2 System wiring (heatronic III boiler connections) with a bypass valve and one unmixed heating circuit
- 13.3 System wiring (CUS boiler connections) with a bypass valve and one unmixed heating circuit
- 13.4 Wiring to PCB in the external unit (heat pump)
- 13.5 Controller circuit board in external unit
- 13.6 Alternative pipe work lengths and T
- 14 General details
- 15 Assembly and installation report for the installer
- 16 Commissioning report for the commissioning engineer

INSPECTION AND MAINTENANCE
6 720 803 687 (2012/11) 53
9.6 INSPECTION AND MAINTENANCE REPORTS
The inspection and maintenance reports are also designed as templates
and may be photocopied.
▶ Sign and date the completed inspection work.
GENERAL INFORMATION
System data
Customer
Installation location
Table 25 Inspection and service reports - general details
Action Confirmation / values
General condition of appliances checked Yes
Filter in the hybrid manager cleaned Yes
Air intake of the external unit cleaned Yes
Visual inspection and function tests carried out on the system Yes
Refrigerant and water pipes checked for the following:
• Tightness
•Corrosion
• Signs of ageing
• Insulation and external damage.
Yes
Hybrid manager checked for the following:
• External damage and blockages
• Flow switch function
• Temperature sensor fittings and function
• Correct adjustment of the hybrid control module.
• Correct adjustment of FW200 programmable controller
Yes
External unit checked for the following:
• External damage and blockages
•Cable insulation
• Fittings of external unit
• Correct installation of ribbon heater (option)
• Secure fixing of the external unit on its foundations
• Excessive oscillations or vibrations emanating from the external unit or pipe
work
• External damage on the external unit including evaporator, fan and casing.
Yes
Outdoor temperature sensor inspected for damage Yes
Correct adjustment of the by-pass valve Yes
Final checks of the inspection tasks carried out Yes
Casing parts installed Yes
Customer instructed and given technical documentation Yes
Correct commissioning by the installing contractor
Signature: __________________
Signature of customer
Signature: __________________
Table 26 Inspection and maintenance report