Specifications
4.0 Maintenance and Repair
4.1 Inspection Checklist
5.0 Document Control
Any changes or updates to this document must be recorded and maintained.
Initially Created By: The Office of Safety and Risk Management
Date: September 2011
Consultation:
Studio Managers and Technicians
Program Chairs and faculty
Date:
January-April 2013
April – May, 2013
Approval By: VPFA and VPA
Date: September, 2013
Review and Revisions Made By:
Date Revised:
Changes Made(indicate sections):
Revisions Approved By:
Date of Approval:
DAILY ✔
Ensure that the power cord is free of frays and damage.
Ensure that the drill is secure with no loose parts.
Ensure that the drill, chuck and bit are free from cracks and defects.
Ensure that all screws are securely tightened. Tighten if required.
WEEKLY
✔
Clean all drill parts.
MONTHLY
✔
Lubricate moving parts to prevent rusting and minimize friction related wear.
ANNUALLY
✔
Inspect entire machine and perform maintenance as required.










