Specifications
DEUTZ FIRE PROTECTION ENGINE / PUMP CHECKLIST 
Page 2 of 2 
Engine Installation Checklist_Aug 28_2007 
Part 2: CHECKLIST FOR PUMP REPRESENTATIVE OR INSTALLING CONTRACTOR* 
  Initial  Date 
A.)  Engine-Pump alignment check; Service coupling/shaft as required.        
B.)  Unit properly mounted & secured; base grouted.   
C.) Controller wiring connected to engine instrument panel.       
D.) Batteries serviced and charged 24 hours; connected to engine.       
E.)  Cooling water connections properly installed on engine heat exchanger,        
both inlet and outlet; Confirm cooling water by-pass solenoid operation     
F.)  Exhaust system properly sized, routed and connected to engine.   
G.) Cooling system filled to proper level with DEUTZ approved coolant. **NOT 
APPICABLE TO OIL COOLED 2011** (See DEUTZ engine operation manual)   
H.) Add DEUTZ approved engine oil to proper level. (see DEUTZ engine operation 
manual)          
I.)  Fuel lines (both supply and return) connected to fuel tank and engine.      
J.)  Fuel tank filled with clean #2 diesel fuel; drain water & sediment from tank.      
K.)  Engine jacket water heater connected to correct AC power (after item G) or oil 
pan heater on 2011 engines (after item H).      
L.) Air inlet filter installed on engine; fresh air supply adequate for engine combustion 
and room ventilation.          
*
These items are to be completed before DEUTZ CORPORATION FIRE PUMP START-UP AND INSTALLATION inspection 
START-UP PERFORMED BY:   
Company Name:  
Mailing Address:  
City:   Postal Code:  
State/Region:   Country:  
Phone #:   Email Address:  
Distributor Name:      
Individual Performing Start-up:   Date:    