Technical data
87
Notes Notes
88
Mounting Leak Detection Fibers
(NF-DW02)
Mounting Pipe-Mounted Fluid Level
Detection Fibers (NF-TF01)
Mounting Pipe-Mounted Fluid Level
Detection Fibers (NF-DF04/-DF05)
If you are using an SUS
bracket, thread a welded M4
stud bolt through the hole on
the bracket and attach an M4
nut (not included with this
product).
If you are using a PVC bracket,
glue it to the mounting surface
such that the side with “TOP”
etched into it is facing up and
glue it within the welding area
as shown in the diagram on the
right.
Slide the male part of the
bracket attached to the steel
case into the female part on the
fiber until you hear them click.
4mm
11mm
M4 nut
straight M4 stud bolt
welding area
female part
male part
Connecting heat-resistant joint fibers to
ordinary-temperature side fibers (NF-TB09)
Operating Temperature
When mounting connecting parts to the
mounting plate
Mounting Heat-Resistant Joint Fibers
(NF-TH12/-TH13/-TH14/-TH15/-TH16)
Mounting Narrow Beam/Wafer Mapping
Fibers (NF-TG01/-TG02/-TG03/-TG04)
When not using brackets
Use cup-point set screws (M3
or smaller) for mounting within
15mm of the tip of the head
as shown in the diagram to
the right.
To connect heat-resistant joint fibers to NF-TB09,
follow the instructions below.
Keep the heat-resistant joint fiber at least 100mm
from the boundary of the ordinary-temperature side in
order to protect NF-TB09 and amplifiers.
Through beam Type
As shown in the diagram below, determine a refer-
ence plane, make sure the optical axis is aligned
properly, and mount the receiving and emitting fibers
so that they are parallel to the reference plane.
Please take care when mounting this product
because its aperture angle is extremely small, and
there are cases where the fibers do not transmit light
because of the way they were mounted.
To mount the parts that connect the heat-resistant
joint fiber and NF-TB09 to the mounting plate with
metal nuts, follow the instructions below.
The mounting plate thickness needs to be 1mm or
thinner.
15mm
Cup-point set screw (M3 or smaller)
Screw tightening range
spring washer
Instructions
NF-TG01
NF-TG02/-TG03/-TG04
①
Attach the plastic nut that comes with the heat-
resistant fiber and spring washer to the tip of
NF-TB09, pushing them back as far as they will
go.
②
Attach the heat-resistant joint fiber to the
NB-TB09 with a locknut.
③
Screw up the plastic nut against the locknut so
that it will not loosen.
Instructions
①
Remove the protective tube from NF-TB09, attach
the metal nut to the tip of the fiber and move it
down to the fiber part.
②
Insert the tip of the fiber through the mounting
plate.
③
Follow the instructions from <Connecting heat-
resistant joint fibers to NF-TB09> to connect the
heat-resistant joint fiber to NF-TB09.
④
Tighten the metal nut from the first step of these
instructions against the mounting plate.
NF-TH□
NF-TB09
spring washer
plastic nut
metal nut
protective tube
remove
plastic nut
locknut
NF-TB09 tip
(these parts come with the heat-resistant joint fiber)
(Note 1): Do not screw up the locknut against the plastic nut.
mounting plate
(thickness of
1mm or thinner)
NF-TB09 fiber tip
(these parts come with
the heat-resistant joint fiber)
Heat / Cold resistant side
(-60 to +200℃)
Ordinary temperature side for
NF-TB09 and amplifiers
At least 100mm
optical axis
receiving
side
emitting
side
reference plane
parallel
parallel
Reference
plane
Parallel
Emitting
side
Optical axis
Parallel
Optical
axis
Reference
plane
Receiving
side
parallel
emitting
side
optical axis
parallel
reference
plane
receiving
side
optical axis
Reflective Type
Overhead View
Positioning Pipe-Mounted Fluid Level
Detection Fibers
Side View
Use 1.6mm M1.4 screws to
mount the fiber head and reflec-
tor to the mounting plate as
shown in the diagram on the
right. The mounting plate needs
to have a thickness of 0.9mm or
thinner.
Use a thread lock compound to
tighten screws when mounting
them in places with vibrations or
shocks.
Attach the parts so that the
holes for the fiber head and
reflector are parallel to one
another and such that parts A,
B and C are each parallel as
shown in the diagrams below.
Use zip ties and anti-slip tubes to mount the clamp to
the pipe as shown in the diagram below.
Use two zip ties on the upper and lower part of the
clamp to attach it securely to the pipe. Cut off the
extra part of the zip ties that stick out.
Use zip ties and anti-slip tubes to mount the clamp to
the pipe as shown in the diagram below. Make sure
that the positioning lever is in the closed position as
shown below when you mount the clamp. Use two
zip ties on the upper and lower part of the clamp to
attach it securely to the pipe. Cut off the extra part of
the zip ties that stick out.
We recommend using zip ties of a thickness 2.5mm
or smaller as shown in the diagram below.
You must use M3 screws, plain washers and spring
washers when using the holes for mounting.
(These parts are not included with this product)
You can easily readjust the attachment position when
using zip ties to mount this product.
We recommend using zip ties of a thickness 2.5mm
or smaller as shown in the diagram below.
fiber head
fiber head
fiber head
holes
holes
reflector
reflector
reflector
Mounting plate
(thickness of 0.9
or thinner)
Mounting plate
(thickness of 0.9 or lower)
1.6mm M1.4 screws
(come with the product)
parallel
A A
C
C
B
B
parallel
parallel
parallel
optical
axis
anti-slip tube
Ⓐ
Ⓐ
zip tie
zip tie
upper
lower
anti-slip tube
positioning lever
2 3.2-diameter holes
AmplifiersFlexible
Various Detecting Scheme
Environment-resistantLiquid
Extension lens
Various Shape for mounting
Notes
Amplifiers
Flexible
Various Detecting Scheme
Environment-resistantLiquid
Extension lens
Various Shape for mounting
Notes










