MOS GB 0733-1 VEDEX 3300 M10528 LE K INSTALLATION AND MAINTENANCE INSTRUCTIONS VEDEX 3300
Contents For Home Owners For the Installer Installation data _ __________________________________ 2 General information for the installer System diagram____________________________________ 3 Boiler room________________________________________ 8 Area of use _______________________________________ 3 Chimney__________________________________________ 8 Product description _________________________________ 3 Assembly__________________________________________ 8 Hot water heating________________________
For Home Owners General Thank you for relying on NIBE to supply your boiler and congratulations on choosing VEDEX 3300, a high quality firewood boiler with a long service life, developed and manufactured in Sweden for Swedish conditions. In order to get the ultimate benefit from VEDEX 3300 you should read through these Installation and Maintenance Instructions. The numbers in brackets refer to the section “Component locations”.
For Home Owners General System diagram T EXP AV SÄV CP2 SV1 SV2 LV T T T VVB ACCU ACCU ACCU RC ELK AV AVT AV AV TG CP1 AV AV AV AVT BV AVT AVT MV The outline diagram shows components that are not included in standard deliveries. Area of use T EXP NIBE VEDEX 3300 is intended for heating domestic houses and other buildings. AV SÄV CP2 Abbreviations HW Hot water SV2 CW Cold water SV1 The boiler is environmentally approved for wood firing to the accumulator tank.
For Home Owners General Indicator lamp for operation Max. thermostat Flue gas thermostat Control switch Charge thermostat Boiler pressure gauge Boiler temperature gauge 40 20 0 60 80 100 120 Indicator lamp for operation Control switch hen the green light comes on, the flue gas thermostat’s W set temperature has been reached. Operating current, on and off.
For Home Owners Settings, instructions and maintenance Settings, instructions and maintenance Charge and circulation pump Sweeping If a charge or circulation pump is not in operation for en extended period of time, it should be started from time to time so that it does not jam. The sweeping carried out by a chimney sweep includes all flue gas routes from the hearth to the top of the chimney.
23, Hål 11,5x29 3 st hål ø36 Hål Ø 52,8 Settings, instructions and maintenanceHål ø6 11,0 23,2 208,0 267,6 345,3 115,0 164,0 208,0 Flue g267,6 as thermostat 327,0 40 T 20 Max. thermostat T T P 60 40 0 20 40 20 0 0 1 3 bar 120 60 80 4 2 1 100 0 bar 120 0 3 4 Before adding the first pieces of wood, check För konsumentbroschyr that the boiler and the heating system are filled with water, and that the flue gas thermometer is installed in the 70 T T T 60 flue pipe.
For Home Owners Wood firing Wood firing Lighting instructions Readjustment It is important that initial firing is carried out carefully in a new boiler so that any remaining crystallisation water in the ceramics is condensed slowly to prevent cracking. The flame can be checked through the sight glass after about 30 minutes operation. The colour of the flame should then be yellow with a light blue tint.
For the Installer General information for the installer General information for the installer Boiler room Note! The boiler room must be built in accordance with applicable building regulations. Ensure that sweeping can be carried out in accordance with the applicable regulations. If in doubt, contact a chimney sweep. Provision for good air supply. The boiler room’s air intake must be as large as the smoke pipe duct.
For the Installer General information for the installer Installing ceramics E F B C D A Pre-installed ceramic kit Ceramic grate Place the ceramic inserts in through the filler door. First position the front stone (B). Then position the rear stones (C) and (D) followed by stones (E) and (F). Flame trough Open the combustion chamber door. Slide in the flame trough (A) on its guides under the ceramic grate. 98 Note! The trough must be slid all the way into the chamber.
For the Installer Pipe installation Pipe installation Connection Filling The pipe installation must be carried out in accordance with current norms. Internal support bushes should be fitted when a steel pipe or annealed copper pipe is used. Fill the boiler with water using a fixed filler line to one of the expansion connections or a hose in the drain valve.
ACCU ACCU For the Installer ACCU Docking to the accumulator ELK AV Docking to the accumulator AV AV AV AV AVT BV AVT AVT Docking to thermal outlet with several tanks and open expansion tank CP1 Note! Reconnection is required in the electrical panel for this type of docking. See ”Electrical installation” – ”Reconnection”.
For the Installer Electrical installation Electrical installation Connection The boiler must be connected under the supervision of an authorised electrician. The connection cable for electrical connection is on the reverse of the boiler. There is a connection area for electrical connection behind the front panel (33). Max. thermostat (3) only controls the boiler’s fan and charge thermostat (19) only controls the external charge pump.
For the Installer Technical specifications Technical specifications Dimensions 70 1320 Ø125 – 159 inv. 180 125 515 1275 1070 590 Minimum distance Minsta avstånd till vägg: 250 mm to the wall: 300 mm 125 1115 min 250 R25 inv. 1150 R25 inv. 170 20-40 85 R32 inv. 450 370 355 305 Ø133 utv. 95 Ø15 utv. R32 inv. 880 Ø15 utv. R25 inv.
For the Installer Technical specifications 53,5 95 Ø 52,8 Component location, boiler section 94 19 45 40 42 95 3 st hål ø36 27 125 3 Hål 11,5x29 10 65 64 36 2 3 19 45 40 Hål 97 42 ål ø6 Hål 94 18 27 R25 inv. 125 2 10,5 36 20 10 11 65 64 28 97 11,0 100 68 18 97 R25 inv. 20 84 23,2 64 11 23 28 100 68 5,5 97 48,0 84 64 115,0 23 164,0 Ø133 utv. 208,0 96 96 267,6 66 66 327,0 83 83 345,3 22 Ø133utv. utv. Ø15 96 R25 inv.
For the Installer Technical specifications List of components 2 3 10 11 18 19 20 22 23 27 28 33 36 40 42 45 64 65 66 68 81 82 83 84 94 95 96 97 98 99 100 Flue gas thermostat Max. thermostat Fan Adjusting primary air Connection cable electricity Charge thermostat Electrical socket for charge pump Cooling coil Ø 15 ext.
For the Installer Technical specifications Enclosed kit 1 x Soot brush 1 x Soot brush shaft 1 x Ash scraper 1 x Tapping valve 1 x Ash shovel 1 x Flue gas thermometer 1 x Soot door with gasket 1 x Angled flue pipe 6 x Turbulators 1 x Soot panel 1 x Installation and Maintenance Instructions Accessories Flue pipe extension for angled flue pipe Charger pack 1 (Part no. 089 872) Rectangular flue pipe extension for angled flue pipe. Contents: Dim ext. 180 x 123 mm Length 750 mm RSK No.
For the Installer Technical specifications Technical specifications Height 1 070 mm (increases 15 – 40 mm for adjustable feet) Width 450 mm Depth 880 mm Weight 290 kg Boiler water volume Voltage Average output during wood firing Wood magazine volume 65 litres 230 V 33 kW 95 litres Wood magazine width 300 mm Wood magazine depth 550 mm Filler door width 300 mm Filler door height 250 mm Max. permitted total current for connected units Max.
For the chimney sweep Sweeping Sweeping Sweeping description Fan ■■ Remove the cover from the mounting points in the The fan is a central part of VEDEX 3300 and should be treated with care. The fan should be removed and cleaned about twice a year for optimum function and a long service life. boiler. ■■ Lift out the turbulators from the convection part. ■■ Sweep the convection part. ■■ Check that the boiler is off and that no embers are in ■■ Reinstall the turbulators. the combustion chamber.
For the chimney sweep Sweeping Cover plate To prevent soot from getting into the flue gas fan when sweeping, use the supplied cover plate as follows: ■■ Remove the soot door. ■■ Insert the cover plate over the hole as illustrated. ■■ Reinstall the soot door to prevent soot exiting when sweeping. ■■ Do not forget to remove the cover plate when sweeping is complete.
20 VEDEX 3300
CZ NIBE CZ, V Zavetri 1478/6, CZ-170 00 Prague 7 Tel: +420 266 791 796 Fax: +420 266 791 796 E-mail: centrala@nibe-cz.com www.nibe-cz.com DE NIBE Systemtechnik GmbH, Am Reiherpfahl 3, 29223 Celle Tel: 05141/7546-0 Fax: 05141/7546-99 E-mail: info@nibe.de www.nibe.de DK Vølund Varmeteknik, Filial af NIBE AB, Brogårdsvej 7, 6920 Videbæk Tel: 97 17 20 33 Fax: 97 17 29 33 E-mail: info@volundvt.dk www.volundvt.