Service Manual
325/328 Excavator
35 Operation and Maintenance Manual
ATTACHMENTS (CONT’D)
Using The X-Change System (Cont’d)
Installing Bucket Or Attachment (Bolt On X-Change)
(Cont’d)
Figure OI-79
Install the bolts (Item 1) [Figure OI-79] through the plate
and into the X-Change.
Tighten the bolts to 177 N•m torque. Re-torque the bolts
after every eight hours of operation.
Check for proper installation.
Lift the attachment and fully extend and retract the bucket
cylinder.
WARNING
Keep all onlookers 6 m away from equipment when
operating. Contact with moving parts, a trench
collapse or flying objects can cause injury or death.
W-2119-0788
P-49719
1
1