Service Manual
325/328 Excavator
33 Operation and Maintenance Manual
ATTACHMENTS (CONT’D)
Using The X-Change System (Cont’d)
Installing Bucket Or Attachment (Bolt On X-Change)
(Cont’d)
Figure OI-74
Install the pin (Item 1) in the X-Change. Orientate the bolt
holes (Item 2) [Figure OI-74] as shown.
Figure OI-75
Install the bolt (Item 1) [Figure OI-75] and washer
through the X-Change and into the pin.
Figure OI-76
Start the engine and move the arm towards the bucket.
Raise the boom until the pins (Item 1) engage the hooks
(Item 2) [Figure OI-76] on the bucket.
P-49716
2
1
P-49717
1
P-49835
1
2