Service Manual

325/328 Excavator
27 Operation and Maintenance Manual
ATTACHMENTS (CONT’D)
Using The X-Change System (Cont’d)
Installing Bucket Or Attachment (Pin On X-Change)
(Cont’d)
Figure OI-62
Raise the boom until the pins (Item 1) engage the hooks
(Item 2) [Figure OI-62] on the bucket.
Figure OI-63
Raise the boom and extend the bucket cylinder until the
X-Change contacts the attachment back [Figure OI-63].
With the arm vertical, lower the boom until the hooks
(Item 1) of the bucket disengage the pins (Item 2) of the
X-Change and the plate (Item 3) [Figure OI-63] fully
engages in the bucket crossmember.
WARNING
Keep all onlookers 6 m away from equipment when
operating. Contact with moving parts, a trench
collapse or flying objects can cause injury or death.
W-2119-0788
P-49835
2
1
P-49837
1
2
3