Service manual
LIFT CYLINDER(S) (Cont’d)
Removal And Installation (Cont’d)
Remove the retaining bolt and nut (Item 1) [A] from the
retaining pin on the base end of the cylinder.
Installation: Tighten the retainer bolt and nut to 18–20
ft.–lbs. (24–27 Nm) torque.
Remove the retaining pin from the base end of the
cylinder [B].
Slide the cylinder forward for clearance to disconnect the
hoses.
Mark the hoses for correct installation.
Disconnect the two hoses (Item 1) [C] from the lift
cylinder.
Remove the lift cylinder.
Always clean up spilled fuel or oil. Keep heat,
flames, sparks or lighted tobacco away from
fuel and oil. Failure to use care around
combustibles can cause explosion or fire
which can result in injury or death.
W–2103–1285
A
CD–15070
1
C
CD–15073
1
–2–10–
853, 853H Loader
Service Manual
B
CD–15072