User's Manual

CAUTIO N: READ ALL WARNINGS BEFORE USING OR ATTEMPTING ANY WORK ON
YOUR MARKER. SHOULD YOU BE UNSURE AT ANY POINT, STOP AND SEEK
PROFESSIONAL SUPPORT.
Maintaining the Poppet Valve
Accessing the Poppet
Poppet valve maintenance is rarely required and incorporates parts of previous maintenance steps.
1. Begin by removing the bolt, back cap,
and ram.
2. Remove the eye cover screws,
detents, and the eye PCB retaining
screws. You can leave the eyes
connected to the wiring harness.
3. Remove the LPR from the front of the
marker.
4. Loosen the rear grip frame screw,
accessible from the top of the marker
through the ram area, approximately
1.5 turns. This screw does not need to
be removed.
5. Loosen the bottom screw on the feed
neck. Leave the feedneck in place
until you remove the other screws.
6. Remove the two forward facing body
screws.
7. Remove the front grip frame screw
located between the HPR and the
trigger guard.
8. Tilt the body up slightly from the grip
frame
9. Remove the feedneck then slide the
front body half forward and off of the
back half.
10. The tapered poppet return spring
may fall free from the poppet, if not,
pull it off and place it to the side.
11. Remove the poppet valve from the
rear of the marker. Fingers, needle
nose pliers, or pushing it from the ram
area with a wooden chopstick all
work.
4
5
6
7
11
9