Installation Guide
Installation Instructions
Instructions d'installation 
Step/ Étape 4
Use the provided screws by screwing them 
into the metal base clamp (1). Screw them 
tightly without stripping the screw heads.
Utiliser les vis fournies en les vissant dans la 
pince de base métallique (1). Vissez-les 
fermement sans décaper les têtes de vis. 
Step/ Étape 5
Securely attach both HOT (1) and COLD (2) 
water hoses to the faucet. 
Fixer solidement les tuyaux d'eau CHAUDE (1) 
et FROIDE (2) au robinet. 
Step/ Étape 6
Connect the water hoses (1) onto the water 
valves (we recommend to use plumbers 
tape to prevent leakage). Turn on water 
valves. 
Raccorder les tuyaux d'eau (1) sur les robinets 
d'eau (nous recommandons d'utiliser du 
ruban de plomberie pour éviter les fuites). 
Ouvrir les robinets d'eau. 
Note: A small amount of water may run from the 
spout or drip for a very short period after the 
faucet is shut off. This is a natural occurrence 
caused by long, flexible hoses. 
Remarque: Une petite quantité d'eau peut couler à 
partir du bec ou dégoutter pendant une très courte 
période après la fermeture du robinet. Ceci est un 
phénomène naturel causé par de longs tuyaux 
flexibles. 








