Technical information
In the next step, measurements can be taken from each of the contacts to the housing of the electrical machine
electronics. The housings of all high-voltage components are connected via GND by means of potential compensation
lines (aluminium drive module). If a high-voltage potential is present at the housing and/or at GND due to damage, it can
be measured with this procedure.
If no voltage is measured at any time, one can assume that the system is no source of danger.
.
9. Installing the high-voltage connector
In order to rule out further improper treatment, install and lock the high-voltage connector again. The smaller connector
(HV switch-off) must not be installed again.
.
10. Close engine compartment with service cap
.
3.2 Vehicle on fire
In general, all statutory requirements relating to a conventional vehicle on fire are to be observed.
No explosion will occur in the event of a reaction of the lithium ion high-voltage battery triggered by the fire. A quick
Page
40
of
66
<!
----
>
2/24/2015
file://C:\Users\QX54891\AppData\Local\Temp\14\DW_Temp_QX54891\VUL
-
REL
-
BM
...










