Owners manual

4”Z1W/S CORE DRILL
8
MACHINE AS HAND HELD UNIT
TRANSPORTING THE MACHINE
Ø When transporting the machine, always use two hands.
Ø DO NOT transport the machine with bits in the spindle.
Ø If transporting inside a vehicle, it is recommended to transport it on its side so as to
avoid the item falling over.
Ø DO NOT carry the machine by the cord.
Ø DO NOT allow the cord or plug to drag along the floor when transporting.
RUNNING THE MACHINE USING THE HANDHELD DRILLING METHOD
Ø Do all pre-operational and operational safety checks from Chapter 1.
Ø Disconnect the machine from the drilling rig by unbolting the C clamp assembly and
sliding the drill upwards out of the drilling rig.
Ø Consider your security and stability as well as the orientation of the machine in the
work area.
o DO NOT use this item in an unstable position (such as on a ladder, leaning
outside of center of gravity, etc). When using by hand, these drills could bind
up and personal injury could occur if not taking into account a very stable
body position.
o Consider the work surface material, condition, strength, density and rigidity.
These factors directly affect the tools efficiency.
Ø Ensure the secondary drill handle is securely attached.
Ø Ensure the work surface is free of debris, oil, etc.
Ø If using “wet” type bits, set up your drilling templates or other professional methods
for starting your hole.
1) Gear Shifter
2) Shoulder Rest
3) 1-1/4” Drill Spindle
4) Drill Motor
5) Secondary Drill Handle
6) Motor On/Off Switch
7) Tightening Nut for Secondary
Handle