MODIFYING AIR HANDLER HOUSING (CONT.)
FIGURE 14
Both Coil Support Brackets Installed
FIGURE 15
Air Seals Installed
1. Install evaporator coil with insulated drain pan assembly
on the downflow coil support brackets.
2. Re-install the connection panel making sure that the
openings are properly aligned with the refrigerant lines.
3. Re-install and fasten the blower panel in the inverted
position.
4. Re-install and fasten the access panel.
5. Size 18 & 24 units only: Affix the provided wiring
diagram (Part J) to the exterior of the unit access panel.
6. Install converted air handler onto floor opening. Apply
sealant as required.
7. Install air filter.
FIGURE 16
Installing Coil
REINSTALLING IN DOWNFLOW CONFIGURATION
FIGURE 13
Installing Insulated Coil Support