Installation & Owners Manual 2017
Blueridge Owners Manual
30
Document Version: 01/2017
Copyright 2017 Alpine Home Air Products
Single Zone (cont.)
• After the copper lines have been connected, and the pressure test is
complete, you may connect your vacuum pump, manifold gauges, micron
gauges and evacuate the lines.
• Once it is confirmed that the joints have a proper connection, pull a vacu-
um down to 500 microns.
• After the vacuum is complete, close manifold gauge valve(s), and open
both the service valves fully, release the refrigerant into the system, and
start the system.
• Ensure the gauges do not show any restriction
• Remove gauges once the system is operating properly.
Multizone with Service Ports for Each Zone:
Vacuuming
1. Connect the first zone’s copper lines.
2. Pressure test and repair leaks.
3. Connect manifold gauges, micron gauge, and vacuum pump and evacuate
the lineset.
4. Pull a vacuum down to 500 microns.
5. Close manifold gauge valves and open both the service valves fully, re-
leasing refrigerant into the system.
6. Move on to the next zone and repeat Steps 1-5.