Installation & Owners Manual 2017

Blueridge Owners Manual
30
Document Version: 01/2017
Copyright 2017 Alpine Home Air Products
Single Zone (cont.)
After the copper lines have been connected, and the pressure test is
complete, you may connect your vacuum pump, manifold gauges, micron
gauges and evacuate the lines.
Once it is confirmed that the joints have a proper connection, pull a vacu-
um down to 500 microns.
After the vacuum is complete, close manifold gauge valve(s), and open
both the service valves fully, release the refrigerant into the system, and
start the system.
Ensure the gauges do not show any restriction
Remove gauges once the system is operating properly.
Multizone with Service Ports for Each Zone:
Vacuuming
1. Connect the first zone’s copper lines.
2. Pressure test and repair leaks.
3. Connect manifold gauges, micron gauge, and vacuum pump and evacuate
the lineset.
4. Pull a vacuum down to 500 microns.
5. Close manifold gauge valves and open both the service valves fully, re-
leasing refrigerant into the system.
6. Move on to the next zone and repeat Steps 1-5.