BG802DF Installation Instructions
Table Of Contents
- BG802DFE Gas Furnace
- Unit Dimensions
- Parts Arrangement
- Shipping and Packing List
- Safety Information
- General
- Combustion, Dilution & Ventilation Air
- Downflow Installation
- Filters
- Duct System
- Venting
- Gas Piping
- Electrical
- Integrated Control DIP Switch Settings
- On-Board Links and Diagnostic Push Button
- Unit Start-Up
- Other Unit Adjustments
- Heating Sequence of Operation
- Service
- Repair Parts List
- Blower Performance
508145-01B Issue 2108 Page 9 of 36
RIGID LEG
remove shipping bolt and washer
Units with 1/2 or 3/4 HP Blower Motor
Figure 7.
The blower access panel must be securely in place
when the blower and burners are operating. Gas fumes,
which could contain carbon monoxide, can be drawn
into living space resulting in personal injury or death.
WARNING
Downow Installation
Downow unit installs in three ways: on non-combustible
ooring, on combustible ooring using a downow
combustible ooring base, or on a reverse-ow cooling
cabinet. Do not drag the unit across the oor.
Installation on Non-Combustible Flooring
(Figure 8)
1. Cut oor opening keeping in mind clearances listed
on unit rating plate. Also keep in mind gas supply
connections, electrical supply, ue and air intake
connections and sucient installation and servicing
clearances. See Table 1 for correct oor opening size.
2. Flange warm air plenum and lower the plenum into the
opening.
3. Set the unit over the plenum and seal the plenum to
the unit.
4. Ensure that the seal is adequate.
Figure 8.
UNIT
SUPPLY AIR
PLENUM
OPENING
Cabinet
Width
Front to Rear Side to Side
in mm in mm
A (14-1/2”) 19-3/4 502 13-1/4 337
B (17-1/2”) 19-3/4 502 16-1/4 413
NOTE - Floor opening dimensions listed are 1/4 inch (6 mm)
larger than the unit opening. See unit dimensions on Page
2.
Table 1. Non-Combustible Floor Opening Size
Installation on Combustible Flooring
(Figure 9)
1. When unit is installed on a combustible oor, a
downow combustible ooring base must be installed
between the furnace and the oor. The base must be
ordered separately. See Table 2 for opening size to
cut in oor.
2. After opening is cut, set combustible ooring base into
opening.
3. Check sealing strips on combustible ooring base to
make sure they are properly glued and positioned.
4. Lower supply air plenum into downow combustible
ooring base until plenum anges seal against the
strips.
NOTE: Be careful not to damage sealing strips. Check
for a tight seal.
5. Set the furnace over the plenum.
6. Ensure that the seal between the furnace and plenum
is adequate.
The furnace and downow combustible ooring base
shall not be installed directly on carpeting, tile, or other
combustible material other than wood ooring.
IMPORTANT
Figure 9.
UNIT
SUPPLY AIR PLENUM
DOWNFLOW
COMBUSTIBLE
FLOORING BASE
PROPERLY
SIZED FLOOR
OPENING