Instructions
2
• Small rubber mallet or hammer w/piece of wood
• Phillips head screwdriver
• Pliers
• Liquid soap or lubricant
• 40 lbs. of sand (sold separately)
• Funnel
TOOLS REQUIRED
EASY POOL STEP
(NE113)
This carton (NE113) contains ALL the necessary pieces and instructions for installation of
your new step. Please follow all instructions for proper installation of this step.
EASY POOL STEP WITH OUTSIDE LADDER
(NE126)
EASY POOL STEP ENTRY SYSTEM
(NE138)
NOTE
The sequence of the instructions may vary at points
depending on the type of step system that you have
purchased. If there are different instructions for your
system, it WILL BE indicated within the step.
Please follow these notes to avoid additional steps and
wasted time.
This is carton 1 of 2. The step and the necessary instructions for installation are included
within this carton. You should have a second carton labeled which contains the outside
ladder for this system (NE126B). All the necessary instructions for installation of the ladder
are located inside the second carton.
There are four cartons necessary to install your new bridge. You should have 2 step cartons
(NE113) which include the instructions necessary to install the steps only. The third
carton contains the crossover (NE138B) necessary to connect the two steps. The instructions
for the assembly and installation of the crossover are located in the crossover box. Carton 4
is the gate carton (NE138C) which includes the necessary components for the gate and
instructions for gate installation.










