Owners manual

9
STEP 9
Locate the interior portion of the ladder. This
is the portion of the ladder that has the
entrapment barrier attached to it.
Using a funnel fill both legs with sand. Use
approximately 20 Lbs. of sand in each leg.
Lay one handrail (G) on a flat surface and push the
connected dowels of the platform into the openings
on the handrail until fully seated. Make sure treads
of platform are facing upward.
Attach the second handrail (G) to the platform the
same way.
FILL LEGS WITH SAND
USING A FUNNEL
STEP 10
FOR 54” POOLS NO MODIFICATIONS ARE NECESSARY