Owners manual

6
STEP 6
Put ladder aside for now and install handrails (D)
onto platform (F) .
Lay one handrail on at surface and push the
connected dowels of the platform into the openings
on the handrail until fully seated. Make sure treads
of platform are facing upward.
Before attaching second handrail, make sure that
the longer part of the handrail is facing in the same
direction on both handrails. Repeat above for
installation of second handrail.
Center locking cap (J) over opening on side of
handrail where platform was just attached.
Using a rubber mallet or a hammer and a small
piece of wood, tap on cap until the cap is ush
with the handrail
Repeat for each of the remaining (3) locking
caps.
Coat the tops of the legs with lubricant and attach
handrails by pushing them down over the legs.
Secure with (4) #10 1-1/4” screws through each
of the pre-marked openings.
Coat adjustable tube (C) with lubricant and slip
(1) mounting block (B) all the way down over the nubs on the tube. The open side should
be exposed.
Repeat for second adjustable tube and mounting block.
Push one adjustable tube into the longer part of each handrail. The mounting block
should sit on the top step to hold the ladder in place. Secure into handrail using
(4) #10 1-1/4” screws in pre-marked openings.
Move tube down to deck until it rests on the deck. Using the proper hardware
(not included) screw mounting blocks into decking through the pre-drilled holes.
STEP 7—DECK MOUNT
NOTE
If attaching to a Deck proceed to STEP 7
If attaching to a Step to create the Entry System proceed
to STEP 8