Instructions / Assembly

No Diving or Jumping. Observe all Safety Rules
1-30
Sec on
1
GENERAL INSTRUCTIONS - YARDMORE OVAL POOLS
GROUND PREPARATION
E. ASSEMBLING THE BUTTRESS STRAPS AND PRESSURE PLATES
1. Assemble the buttress straps and brace
a. Place crushed stone or soil where the pressure
plates are located. This will have the effect of
supporting the pressure plate.
b. Put pressure plates on the tip of the strap end
channel to 20 1/2“ from the steel upright. The side
that is corrugated must be facing up and the flat
side facing the ground.
(Images 24 & 25)
c. For the alignment of the pressure plate there is a
hole at less than one inch from the edge of the
plate. This hole is facing the vertical part of the
steel structure. Once the plates are in position,
secure them to the channels using two #12 x 3/4
screws. (Image 26)
d. Once all plates are secured to the channels, the
plates should overlap each other. Secure the plates
to each other using three #12 screws in each
overlapping area.
e. You may now go back to step 2-Digging the
buttress trenches, to continue for the remaining
side of the oval.
24
25
26
Important Note:
If the holes do not align, DO NOT drill holes! Verify the
alignment of the structures.
NOT GOOD
GOOD